754 2718489

info@arbuildingconsulting.com

License CGC#1534799 / CPC#1460732

Thinking of Building a Pool? Here’s What the Process Really Looks Like

Building a custom pool isn’t just about digging and filling — it’s a detailed, well-orchestrated process that requires planning, approvals, and quality craftsmanship. Here’s a breakdown of each phase, including estimated timelines:

 

1.PHASE 1: Design, Proposal & HOA Approval

Estimated Time: 1–3 weeks

We begin with a consultation and site evaluation, where we listen to your ideas, assess your space, and offer expert input. Then we create a custom 2D and 3D design showing your new pool, outdoor kitchen, decking, or gazebo — fully tailored to your lifestyle.

🔹 Once the design is ready, we present you with a detailed proposal outlining scope, materials, and budget.

🔹 If your property is in a Homeowners’ Association (HOA), we also prepare a professional package for HOA submission and approval.

 

 

2. PHASE 2: Full Set of Plans Creation

Estimated Time: 4 weeks
 
After HOA approval (if required) and design approval, we begin the engineering and construction documents. These include:
 
•Structural and plumbing plans
•Electrical and gas layouts
•Grading, drainage, and deck plans (if applicable)
•Equipment layout and technical specs
 
These stamped plans are essential for city or county permit applications.
 

PHASE 3: Permitting & Municipality Approval

Estimated Time: 3–8 weeks (varies by city/county)

We handle the full permit application process with your local building department. Each municipality has its own processing time and may require:
 
•Zoning checks
•Flood zone or easement clearance
•Drainage or utility reviews
 
We stay on top of follow-ups to keep things moving.

PHASE 4: Construction

Estimated Time: 8–12 weeks (depending on features and weather)

 
Once permits are approved, we begin construction. The phases include:
 
1. Layout & Excavation
2. Steel, Plumbing & Inspections
3. Gunite or Shotcrete Application
4. Tile, Coping & Masonry Work
5. Decking & Hardscape
6. Equipment Installation
7. Interior Finish (Pebble, Quartz, etc.)
8. Pool Fill & Startup
 
We coordinate all required inspections with the city or county throughout the process.

PHASE 5: Final Inspections & Client Handover

Estimated Time: 1–2 weeks

Once the project is complete, we schedule the final inspection with the city. After approval, we give you a full orientation on:
 
•Pool maintenance
•Equipment use
•Smart system controls (if installed)
•Safety features
 
You’ll be ready to enjoy your pool from day one!
 

 Estimated Total Timeline: 14–26 weeks

From the initial design to your first swim, the full process takes approximately 3.5 to 6 months, depending on:
 
•Municipality timelines
•Custom features (spa, gas lines, automation)
•HOA approvals
•Weather conditions
 
 Ready to Dive In?
 
DM us or click the link in bio to schedule your free consultation.
From design to build, we’ve got you covered 

Why Choose A&R BAL Building & Consulting?

  1. With over 5 years of experience building pools across South Florida, licensed professionals, and a full-service approach, A&R BAL offers:

    • Custom pool design
    • Permit and inspection management
    • High-quality materials and expert craftsmanship
    • Modern finishes and tech integration
    • Full customer support after the build

    Whether you want to create a family hangout spot, a resort-style retreat, or add property value — we help you build smarter and better.

    📍 Ready to Build Your Dream Pool?

    Contact A&R BAL Building & Consulting today for a free consultation and let’s bring your vision to life.

    https://arbuildingconsulting.com/index.php/contact-us/

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *